SLNKO
PM KusumPortfolio
Contact

Tools

Project cost calculator

Indicative EPC-style estimate based on plant capacity, overloading, and cost per watt - including 8.9% GST on the project base.

Project inputs

Enter site details to estimate indicative project cost.

AC capacity above DC nameplate (e.g. inverter loading). Use 0 if not applicable.

2050/W

Share financed by loan. Down payment is calculated as the remainder of total project cost (incl. GST).

%

10%–90% (steps of 10%)

Loan terms (indicative)

Select interest and tenure for EMI estimate. Tenure up to 20 years.

7.5%–10% (decimal allowed)

120 years

Tariff assumptions (indicative)

2–₹10 per unit (decimal allowed)

Estimated output

Results appear after you run the calculation.

Fill in the form and click Calculate project cost to view indicative numbers.